VTTI: New Automated Fuel Storage Facility

, ,

We implemented UNI Engineering’s design for VTTI’s Seaport Canaveral Terminal, a new fuel storage facility for gasoline and blending agents. The system included all tanks, 110-foot marine loading arms, a six-bay truck rack system, and four vapor combustion units.

We bussed all I/O using gateways. We created custom code with function block programming and Wonderware application server on S88 architecture. And we automated the truck rack system and created an interface to the business system.

We provided all onsite management of system design and installation. We inspected and installed all panels, and our electricians terminated and labeled all control wires onsite.

Services Provided:

  • Configuration of control and equipment modules
  • Configuration of conventional, Foundation Fieldbus, DeviceNet, Ethernet IP, and AS-I I/O types
  • Operator display development
  • Installation and termination
  • Testing
  • Commissioning
  • Onsite construction management and working with inspectors